Sign In | Join Free | My udpf.com |
|
Brand Name : KAIXIANG
Model Number : 1000 KW
Certification : ISO9001
Place of Origin : HEBEI CHINA
MOQ : ONE SET
Price : negotiable
Payment Terms : L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P
Supply Ability : 20 SETS ONE MONTH
Delivery Time : ONE MONTH AFTER GET DEPOSIT
Packaging Details : WOODEN CASE
Rated Voltage : 380 VAC
Installed Capacity : Resistive load: 1010 kW
Control Power : 400VAC/50Hz, 3 phase 4 wire, 230V 1-phase
size : 1600*2400*2100 mm
Ambient Temperature : -10℃~+50℃
Load Step : 1、2、2、5、10、20、20、50、100、200、200、200、200kW, min step load: 1kW
Long Warranty And Economical 1000KW AC Load Bank Quality Tester
Product Description
AC Load Bank offers the most robust, high-capacity designs in the industry. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. AC Load Bank is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Technical Parameters
Rating Voltage/Frequency | 380VAC/50Hz, 3 phase 4 wire, line voltage 380V, phase voltage 220V |
Rated Load Power | Resistive load: 1000kW |
Installed Capacity | Resistive load: 1010kW |
Load Step | 1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 400VAC/50Hz, 3 phase 4 wire, 230V 1-phase |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1600*2400*2100mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 1500kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
Inspection before delivery Strictly debug and inspect the load bank according to technical agreement and related standard, will not delivery until reach the required standard. User can send technicians to production base to accept goods.
Transportation Send goods to designated address safely
On-site service Send technicians to the real working place, assistant to assemble, debug, train, accept and attend the first formal testing
Application
Transformer manufacturing:Measuring the transformr's parameters include rated capacity,current ,voltage ,frequency,temperture-rise and noise and so on.
![]() |
Long Warranty AC Portable Load Bank Economical With 220V Phase Voltage Images |